By Feng Yan, Technical Engineer, CTPPressLast updated: November 2026Quick answer: Print quality control works best…

By Feng Yan, Technical Engineer, CTPPress

Last updated: November 2026

Quick answer: Print quality control works best when you control the process and do not only inspect sheets. Pick one variable, such as solid ink density, take a small subgroup of readings at a fixed interval, and plot the average and the range on a control chart. Limits calculated from the process’s own data show when to act and when to leave the press alone. Compare those limits with the customer’s tolerance to see whether the process is capable.

Key takeaways

  • Inspection sorts sheets after they are printed. A control chart warns the operator before sheets go out of tolerance.
  • Chart variables you already measure: solid ink density, tone value increase, register, ink viscosity, pH and a plate dot reading.
  • Plot the average and the range of small subgroups, with control limits calculated from the process’s own data.
  • Act on a point outside the limits or a run of points on one side of the centre line. Otherwise leave the press alone.
  • Control limits are not customer tolerances. Compare the two to see whether the process can hold the job.

You measure density on every job. The readings go into a log, the sheets are inside tolerance, and the shifts still argue about whether the press is in control. One operator moves the ink keys after every reading and the colour keeps moving. Print quality control becomes simpler when the readings go on a chart with limits that tell the operator when to act. This guide explains statistical process control (SPC) in printing in plain steps.

Inspecting sheets versus controlling the process

A common belief is that if every sheet we check is inside the customer tolerance, the press is in control. That is inspection, and inspection only sorts sheets after they are printed. A control chart shows whether the process is stable, and it warns the operator before sheets go out of tolerance.

Sheets between the checks are never seen, which explains a familiar complaint: the sheets were inside tolerance when we checked, and the customer still rejected the job.

Every process varies; what matters is whether the variation is normal and steady, or whether something has changed: a new ink batch, a blanket wash, a plate from another batch. Adjusting the press for normal variation usually adds variation. Correcting a real change is the operator’s job. The chart shows which of the two you are looking at.

What is not measured cannot be managed. Measure at a sensible interval and plot the reading where the operator can see it. A chart filled in at the end of the shift is only a record. Plotted at the press, it is an early warning.

What to chart in the pressroom and plate room

Variable Where it is read Instrument
Solid ink density Solid patches on the print control strip Densitometer
Tone value increase (offset dot gain, flexo dot gain) Tint patches on the control strip Densitometer or spectrophotometer
Register (see misregistration) Register cross marks Magnifier
Ink viscosity (see the Zahn cup guide) Ink in the circulating system, flexo and gravure Efflux cup and stopwatch
pH Water-based ink; fountain solution in offset pH meter
Plate dot reading A tint patch on the plate control strip Plate reader

Also count good sheets, waste sheets and plate remakes for the Pareto chart below.

The chart does not set the target. Targets and tolerances come from your customer, your standard and your suppliers’ data sheets. For offset tone value increase aims, see ISO 12647-2 for plate rooms.

The basic quality tools and when each helps

The control chart is one of seven basic quality tools.

Tool Use it to
Flow chart Define the steps of a process and write a standard procedure
Cause-and-effect (fishbone) diagram List the possible causes of one fault under people, method, environment, material and machine
Check sheet Collect data in an orderly way, for example a tally of pH readings
Pareto chart Rank causes in descending order of count, with a cumulative percentage, and fix the largest first
Run chart or control chart Watch one variable over time and warn the operator early
Histogram Compare the total spread of the process with the customer tolerance
Scatter diagram Test a belief that two variables move together, such as press speed and waste

A fishbone diagram gives candidate causes, not proof, so collect data before you decide which cause is real. A Pareto chart ranks causes by count, not by opinion. Our guide to reducing plate remakes uses the same idea with a reason for every remake.

How to build an average-and-range chart

An average-and-range chart, often written as an X-bar and R chart, is the usual control chart for print density and other measured variables.

  1. Choose one variable, one patch and one instrument. For example, black solid ink density on the control strip.
  2. Take subgroups. At a fixed interval, pull a sheet and take the same number of readings. One published worked example pulled one sheet every half hour and read it five times.
  3. Work out the average and the range of each subgroup. The range is the highest reading minus the lowest. In that example the first sheet read 1.53, 1.46, 1.48, 1.50 and 1.43: an average of 1.48 and a range of 0.10.
  4. Find the two centre lines. These are the average of all the subgroup averages and the average of all the ranges. The example had 12 subgroups, a grand average of 1.49 and an average range of about 0.09. A common guide is at least 30 samples before you treat a chart as established, so twelve subgroups give trial limits only.
  5. Calculate the control limits. They come from the process’s own data and sit about three standard deviations either side of the average. Two methods are in use.
  6. Draw and plot. Put the average chart above the range chart. The operator plots each new subgroup at the press.
Method How the limits are calculated Result in the example
Standard deviation of the subgroup values Grand average ± 3 standard deviations of the subgroup averages. Average range plus 3 standard deviations of the ranges. Averages 1.44 to 1.54; ranges up to 0.18
Average range with chart constants Grand average ± average range times the constant for your subgroup size. Average range times a second constant. Averages 1.44 to 1.54; ranges up to 0.18

Here the two methods agree to two decimal places, but they do not always. The first uses the spread between the subgroup averages, the second the spread inside the subgroups. When the process moves between subgroups more than it varies inside one, the first method gives wider limits, and the two can disagree about whether a point is outside. Most SPC references and software use the second method. Use the method your customer or quality system names, take the constants from your SPC reference, and keep to one method.

How to read the chart: limits and runs

Read the average chart and the range chart together.

What the chart shows What it may mean What to do
A point outside the control limits Something in the process has probably changed Find what changed, correct it and note it on the chart
Four points in a row on one side of the centre line The process level may have changed Look for what changed at that time
Four or more points moving in one direction towards a limit The process may be drifting Check before the points reach the limit
Points inside the limits, spread evenly on both sides of the centre line Normal variation Leave the press alone

The four-point signals follow one published pressroom rule, which is strict. Many general SPC references ask for a longer run. A short run reacts sooner but gives more false alarms. Choose one rule and train every shift to use it.

In the worked example, the last four subgroup averages were all below the centre line, one of them only just. Under the four-point rule that is a prompt to look for what changed, not proof of a fault.

Control limits versus customer tolerances and process capability

Another common belief is that control limits are the customer’s tolerances. They are not. Control limits come from the process’s own data. Tolerances come from the customer. Compare the two to judge process capability.

First check that the control limits sit inside the tolerance; if points come close to the tolerance, rejects are possible. In the example the customer specification was 1.50 ± 0.07 (1.43 to 1.57), and the limits of 1.44 to 1.54 sat inside it. But averages hide single readings. One reading in the same data was 1.40, below the lower tolerance, although every subgroup average was inside. So judge capability from a histogram of the single readings.

  • Spread. In a stable process with a bell-shaped histogram, about 68% of readings fall within one standard deviation either side of the average, about 95% within two and about 99.7% within three. The process can hold the job reliably only when the tolerance either side of the target is at least three standard deviations and the average sits on the target. Check whether the tolerance is written as plus or minus or as a total width.
  • Shape. Two peaks mean two sets of data are mixed, for example pH readings from two inks. Separate them and chart one variable at a time.
  • Sample size. With fewer than 30 samples, do not draw a capability conclusion.

The control strip, the instruments and how to start small

Every job should carry a print control strip. Where a full strip does not fit, a common minimum in flexo work is a shadow tint and a highlight tint for each process colour and each spot colour.

  • By eye first. Register, slur and doubling, trapping, grey balance and colour against the contract proof.
  • Densitometer. Solid ink density and tone value increase.
  • Spectrophotometer. Preferred when spot and process colours are controlled together, or when a colour difference is calculated.
  • Plate reader. Tint patches on the plate. A stable plate chart lets you rule the plate out when the press chart moves.

Two objections are common: “SPC needs software and a statistician” and “we do not have time to fill in charts”. Neither holds for one chart. Start with one press, one colour and one variable. Use a paper chart at the press and let the operator plot the points. Note every event on the chart: a new ink batch, a wash, a plate change.

FAQ

What is print quality control?

It is the measurements and checks that keep a printed job inside the customer’s tolerance. It works best when you chart variables such as solid ink density during the run, not only inspect finished sheets.

What is SPC in printing?

SPC, or statistical process control, means measuring a variable at a fixed interval, plotting it on a control chart and using limits calculated from the process’s own data to decide when to act.

How do you make a control chart for print density?

Pull a sheet at a fixed interval and take the same number of readings of one solid patch. Work out the average and the range of each subgroup, calculate the control limits from them, and plot each new subgroup at the press.

What is the difference between control limits and customer tolerances?

Control limits come from the process’s own data. Tolerances come from the customer. The control limits should sit inside the tolerance.

What is process capability in printing?

It is whether the normal spread of the process fits inside the customer’s tolerance. The tolerance either side of the target should be at least three standard deviations, with the average on the target.

What does a run of points on one side of the centre line mean?

The process level may have changed. One published pressroom rule treats four points in a row as a signal. Many general SPC references ask for a longer run.

Plates for a new press or a change of supplier? We supply CTP plates for offset printing. Request a quote with your press model, plate size and gauge, or contact us with a technical question.

Disclaimer: the methods on this page are for reference only. The density figures come from a worked example and are not targets. Control limit constants, run rules and capability requirements are subject to your SPC reference, your quality system and your customer’s specification.

About Feng Yan

Feng Yan is a technical engineer at CTPPress with more than 20 years in the printing industry and extensive front-line experience supporting printing plants. Feng specialises in solving the difficult problems printers run into in production.

Talk With Author >>

Start Your Business With Us

Simple Contact Form

Tell us what you need

Request a Quote

Tell us which printing plates or equipment you need, including specifications, quantity and destination. Use the form to send your enquiry.

Aluminium coils and printing plate production equipment
Product Enquiry

Request an Instant Quote

We reply within 24 hours on working days

Product Enquiry
Aluminium coil on an offset plate production line

Send an Enquiry


Product Enquiry
Chat on WhatsApp